Bathroom Remodeling

Bathroom Remodeling in Southern California

Small room, a lot going on behind the wall. We look at the plumbing, the framing and the waterproofing before we quote a single tile, so the shower you love in year one is still dry in year fifteen.

A bathroom at a glance

Construction time
3 to 5 weeks for a full remodel
Typical investment
$25,000 to $40,000 for a hall bath gut
Permits
Filed and inspected by us
Waterproofing
Bonded membrane and a flood test
Our approach

Most bathroom problems start where you cannot see them.

A tired bathroom is usually the least of what is going on. In a lot of the 1970s and 1980s homes we work in around Mission Viejo, Lake Forest and Laguna Hills, the original shower pan has been seeping into the subfloor for years, the supply lines are galvanized, and the fan vents into the attic instead of outside. New tile laid over any of that is a remodel you end up paying for twice.

So before we price finishes, we open an access point, check the pan, look at the framing and confirm where the vent actually goes. Then we tell you honestly whether you need a full gut down to the studs or whether a refresh on the existing layout gets you there for a lot less money.

Every shower we build gets a bonded waterproofing membrane, a sloped pre pan, and a standing water test before a single tile goes on. It is the least glamorous part of the job and it is the part we are most stubborn about.

Bathroom remodel with a white double vanity, quartz top, star pendant lights and gray hex floor tile
Modern bathroom with a floating vanity, wall hung toilet and a glass enclosed walk-in shower
500+Projects completed in OC
Full gut or refresh

Two very different jobs, and we will tell you which one you need.

The right answer depends on what is behind the tile, not on your budget alone. Here is how we decide.

Refresh

Keep the layout, change everything you see

New vanity and top, new toilet, new floor tile, new fixtures, paint and lighting. The plumbing stays where it is and the shower walls stay if they are sound.

The right call when

  • The layout already works for you
  • The shower pan passes a moisture check
  • Supply lines are copper or PEX, not galvanized
  • You want it done in about two weeks

Typical: $14,000 to $25,000 for a guest or hall bathroom

Full gut

Down to the studs and back up again

Everything comes out. We fix what we find, move plumbing if the layout needs it, waterproof properly and build a new bathroom from the framing out.

The right call when

  • You want to move the shower, tub or toilet
  • There is soft subfloor or any sign of a leak
  • You want a curbless or walk-in shower
  • The room still has original galvanized pipe

Typical: $25,000 to $40,000 for a hall bath, more for a primary suite

Not sure which one you are looking at? That is exactly what the free walkthrough is for. Greg will check the pan and the supply lines while he is there.

What we build

Every part of the room, by one crew.

Tile setters, plumbers, electricians and glass installers we have worked with for years, scheduled by us so you are not chasing anybody.

  • Showers

    Walk-in, curbless and tub to shower conversions with niches sized to real shampoo bottles, a bench if you want one, and frameless glass measured after the tile is set.

    • Linear and center drains
    • Thermostatic and handheld valves
    • Frameless glass enclosures
  • Tubs

    Freestanding soakers, drop in tubs with a tiled deck, and alcove tubs for kids bathrooms. We confirm the floor can carry a filled cast iron tub before it shows up.

    • Freestanding and floor mount fillers
    • Tub deck tile surrounds
    • Floor reinforcement where needed
  • Tile and stone

    Porcelain, ceramic, travertine and marble on floors and walls, set flat with tight grout lines and edges finished with metal trim or bullnose, never a raw cut.

    • Large format and hex patterns
    • Heated floor systems
    • Sealed natural stone
  • Vanities

    Furniture style, floating and built in vanities with quartz or stone tops, sized around the storage you actually need. Custom vanities come from our cabinetry shop.

    • Single, double and makeup vanities
    • Undermount and vessel sinks
    • Drawer organizers and outlets inside
  • Fixtures and plumbing

    New supply lines and shutoffs, pressure balanced valves, comfort height toilets and faucets in finishes that will survive the hard water we have here in Orange County.

    • Galvanized to PEX replacement
    • Wall hung and comfort height toilets
    • Brushed, matte and polished finishes
  • Ventilation and lighting

    A quiet exhaust fan vented to the outside on a humidity sensor, layered vanity lighting at face height and dimmable recessed cans so the room works at 6 AM and at night.

    • Humidity sensing exhaust fans
    • Vanity sconces and lit mirrors
    • GFCI protected circuits
Finished SoCal Renovations bathroom with a white double vanity, quartz top and gray hex tile floor
Example of an older bathroom with a corner jetted tub, cultured top vanity and builder grade fixtures
BeforeAfter

Drag the handle, or use the arrow keys, to compare before and after.

Before and after

What a full remodel changes.

An illustrative comparison of the kind of change a full gut makes. A builder grade bath with a cultured marble top becomes a room with real storage, real tile and real light.

  • Two sinks where there was one

    A wider vanity with a drawer bank down the middle so nobody fights for counter space at 7 AM.

  • Floor tile with real slip resistance

    Matte hex porcelain that holds up to wet feet and to the cleaning products that eat polished stone.

  • Lighting at face height

    Pendants flanking the mirrors instead of a single bar above them, so there are no shadows when you shave or put on makeup.

How a bathroom comes together

Waterproofing gets the most time. That is on purpose.

The sequence matters more in a bathroom than anywhere else in the house. Rushing the cure time on a membrane or a mortar bed is how showers fail in year three.

  1. 01

    Inspect and plan

    We check the pan, the subfloor, the supply lines and where the fan vents. Then we lay out the new room and tell you whether it is a refresh or a full gut.

  2. 02

    Select and order

    Tile, vanity, fixtures and glass are chosen and ordered up front, so nothing holds the crew up once demolition starts and you are not without the room any longer than necessary.

  3. 03

    Build and waterproof

    Demolition, rough plumbing and electrical, inspection, a sloped pre pan, bonded membrane and a flood test before tile. Then tile, grout, sealing and trim.

  4. 04

    Fixtures and walkthrough

    Vanity, top, toilet, trim kits and glass go in last. We walk the room with you, run every fixture and close the punch list before we call it done.

What it costs

Bathroom remodel cost in Orange County.

These ranges come from our own jobs across Irvine, Lake Forest, Mission Viejo and Newport Beach. Your estimate will break down tile, plumbing, glass and labor on separate lines.

  • Refresh

    $14k to $25k

    Same layout, new everything you touch and see. Right for guest and hall baths with a sound shower.

    • New vanity, top and faucet
    • New toilet and floor tile
    • Lighting, mirror and paint
    • Shower trim kit refresh
  • Most common

    Full remodel

    $25k to $40k

    Down to the studs. New plumbing, waterproofing, tile on floors and walls and a new shower or tub.

    • Demolition to studs
    • New supply lines and valves
    • Bonded membrane and flood test
    • Floor to ceiling tile in the shower
    • Frameless glass
  • Primary suite

    $45k to $85k

    Larger rooms with a curbless shower, a freestanding tub, a double vanity and stone or large format tile.

    • Curbless shower with linear drain
    • Freestanding soaking tub
    • Custom double vanity
    • Heated floors and lit mirrors

What moves the number

Two projects that look the same in a photo can be thirty thousand dollars apart. These are the reasons, roughly in order of how much they matter.

Fixture and tile allowances are written into your estimate so you can see what is included and choose to go up or down from there.

Get an itemized estimate
  1. 01

    Moving the plumbing

    Relocating a toilet or a drain on a slab means cutting concrete. Keeping fixtures where they are is the simplest way to protect the budget.

  2. 02

    Tile size and pattern

    Large format porcelain and intricate patterns like herringbone take more labor and more waste than a straight lay, and natural stone needs sealing.

  3. 03

    Curbless and walk-in showers

    Recessing the floor so a curbless shower drains correctly is real framing work, and the waterproofing has to run further into the room.

  4. 04

    What we find behind the wall

    Rotted subfloor or a leaking pan is common in older homes. If we find it, you get a written change order with a number before any extra work happens.

  • Travertine tile walk-in shower with a mosaic niche, handheld shower and frameless glass door
  • Custom white double vanity with a marble top, arched mirror surround and basketweave marble floor
  • Modern white bathroom with a floating two tone vanity and glass shower enclosure
  • White double vanity with brushed nickel hardware, framed mirrors and star glass pendants
  • Bathroom with a corner soaking tub, quartz vanity and oil rubbed bronze faucet
Questions

Bathroom remodeling questions.

What homeowners ask us most often at the first walkthrough, answered plainly.

A guest or hall bathroom refresh with a new vanity, toilet, tile floor, and fixtures generally runs 14,000 to 25,000 dollars. A full gut down to the studs on the same room is usually 25,000 to 40,000. A primary suite with a curbless shower, a freestanding tub, a double vanity, and stone walls is typically 45,000 to 85,000. The free estimate itemizes it so you can see which line to trim if the total is over your number.

Service areas

Bathroom remodeling across Orange County.

Every one of these cities has its own era of bathroom, and its own set of problems hiding behind the tile.

Also nearby: Costa Mesa, Santa Ana, Orange, Anaheim Hills, Aliso Viejo, Laguna Niguel, Rancho Santa Margarita, Villa Park, Huntington Beach, Yorba Linda, Foothill Ranch, Ladera Ranch.

Free estimate

Let us take a look behind the tile.

We will check the pan, the supply lines and the vent while we are there, and send back a written estimate that tells you honestly whether it is a refresh or a full gut.

  1. Greg calls you back

    Usually the same day, always within one business day.

  2. We visit and measure

    About an hour at your place, at a time that suits you.

  3. You get it in writing

    An itemized estimate with materials and labor broken out.

4.9 average from 24 Google reviews
(714) 624-9514gregq@socalrenovations.comMonday to Friday, 7:00 AM to 6:00 PM

Tell us about your project

A few details is plenty. We will ask the rest when we call.

Room, rough size, what is bothering you about it now. A few lines is plenty.

No obligation, no sales calls. We reply within one business day.

Finished bathroom with a travertine walk-in shower and frameless glass
Ready when you are

Ready for a bathroom you do not have to apologize for?

Greg will come out, measure, and give you an itemized estimate with no obligation attached. Most people hear back the same day they call.

  • Free in home estimate
  • Written itemized pricing
  • We pull your permits
  • Licensed and insured