Skip to main content
SoCal Renovations, quality first
Remodeled open kitchen and family room with a seated island and a full wall of garden windows
Home Remodel

Full Home Remodeling in Southern California

One room at a time or the whole house top to bottom. Either way you get one crew, one schedule and one number to call, and you never end up without a kitchen and a bathroom in the same week.

A home remodel at a glance

Typical timeline
3 to 6 months for a whole home
Typical investment
$150,000 to $400,000 whole home
Permits
Drawings, filing and inspections, all ours
Point of contact
Greg, from estimate to final walkthrough
Our approach

Whole house work is a scheduling problem as much as a building one.

Plenty of contractors can build a good kitchen. Far fewer can run a kitchen, two bathrooms, new flooring through the house and a wall removal at the same time without the family living in a construction zone for six months. The difference is almost entirely in the sequencing.

We plan the order of trades before demolition starts so you always have a working bathroom and a kitchen sink. Dust walls with zipper doors go up around each active zone, air scrubbers run every day, and the path from the front door to the work is covered. You get a written schedule up front and a text with photos at the end of each week showing where we are against it.

Greg is the single person you talk to for the whole project, from the first walkthrough to the day we hand you the finaled permit. The trade crews are the same people we have worked with for years, not whoever happened to be free that month.

Open plan dining room flowing into a remodeled kitchen with plantation shutters and dark hardwood floors
Painters rolling a fresh coat on an interior wall with drop cloths and tape protecting the floor
1Crew and one schedule
Room by room or top to bottom

Two ways to do it, and neither one is wrong.

The right choice comes down to your budget, your timeline and how much disruption your household can live with. We will lay out both schedules so you can compare.

Room by room

Phase it across a year or two

Start with the room that bothers you most, then come back for the next. Each phase is fully finished and inspected before the next begins, so the house is never half done.

The right call when

  • You would rather spread the spend out
  • You need the house fully livable throughout
  • One or two rooms are the real priority
  • You want to see our work before committing to more

Typical: A single room or a kitchen plus one bath per phase

Top to bottom

Do it once, do it all

Every room in one continuous project. The trades come through one time, the dust containment goes up once, and you only pay mobilization and cleanup once.

The right call when

  • You have just bought the house and have not moved in
  • Floors need to run continuously through every room
  • Walls are coming out and layouts are changing
  • You want the lowest cost per square foot

Typical: 3 to 6 months for a 1,800 to 2,500 square foot home

Most of our whole home clients end up doing something in between. The kitchen and main floor first, the bathrooms and bedrooms in a second phase.

What it can include

Everything a house needs, under one contract.

You are not coordinating a flooring company, a painter, an electrician and a cabinet shop. It is all on one schedule with one invoice.

  • Open concept conversions

    Removing the wall between the kitchen and the family room, with an engineered beam, posts carried to the foundation, and patched ceilings and floors.

  • Flooring throughout

    Hardwood, engineered wood, luxury vinyl plank and tile run continuously through every room with no awkward transitions at the doorways.

  • Paint, trim and doors

    Popcorn ceilings scraped, new baseboard and casing, solid core interior doors, and a full interior repaint in finishes that clean up properly.

  • Lighting and electrical

    Recessed lighting on dimmers, panel upgrades, new circuits for modern kitchens and EV chargers, and every outlet and switch brought up to code.

  • Garage and bonus rooms

    Garage conversions into living space, home offices or guest suites, including insulation, egress windows and the parking requirements your city sets.

  • Exterior updates

    Siding, wood clad columns, eaves, gates, exterior paint and lighting, so the outside of the house finally matches the inside.

Project scale

What a home remodel costs in Orange County.

Real ranges from our own projects. Your estimate will show each room and each trade on its own line so you can phase or trim with your eyes open.

  • Single room

    $15k to $95k

    One kitchen, one bathroom, one living space or one garage conversion, done start to finish.

    • Design and selections
    • All trades for that room
    • Permit and inspections
    • Final walkthrough and punch list
  • Most common

    Main floor

    $90k to $180k

    The kitchen, the family room and the dining area together, usually with a wall coming out between them.

    • Load bearing wall removal
    • Full kitchen remodel
    • Continuous flooring
    • Lighting plan and paint
    • Structural drawings and permit
  • Whole home

    $150k to $400k

    Every room in the house, sequenced so you can usually stay living there throughout.

    • Kitchen and all bathrooms
    • Flooring, trim and doors throughout
    • Electrical and panel upgrades
    • Optional exterior work

What moves the number

Two projects that look the same in a photo can be thirty thousand dollars apart. These are the reasons, roughly in order of how much they matter.

Larger projects can be split into phases with their own estimates, so you only commit to the stage in front of you.

Get an itemized estimate
  1. 01

    Structural changes

    Removing load bearing walls needs a beam, posts and engineering. It is routine work for us, it just needs to be budgeted rather than treated as a surprise.

  2. 02

    Moving wet walls

    Relocating a kitchen or a bathroom means new drain lines, and on a slab foundation that means cutting concrete.

  3. 03

    Finish level

    The same floor plan can vary by a hundred thousand dollars depending on cabinetry, stone, tile and fixture choices.

  4. 04

    Age of the house

    Older homes in Old Town Tustin or the original Mission Viejo tracts can need electrical and plumbing updates before the finishes go in.

Permit handling

You never stand at a permit counter.

Unpermitted work is one of the most common things that derails a home sale in Orange County. We pull a permit for anything that needs one, and we handle every step of it.

What needs a permit? Moving plumbing, adding or changing circuits, removing walls, changing windows and anything that changes the footprint. Like for like swaps, such as a new vanity in the same spot, usually do not. We will tell you which bucket your project is in.

  1. Step 1

    Drawings

    We prepare the floor plans and, where a wall is load bearing, the structural engineering.

  2. Step 2

    Submittal

    We submit to your city building department and to your association if the work touches the exterior.

  3. Step 3

    Plan check

    We answer every plan checker comment and resubmit. You do not go to a counter or wait on hold.

  4. Step 4

    Permit issued

    Fees appear as a pass through line on your estimate with no markup.

  5. Step 5

    Inspections

    We schedule and meet the inspector at rough, framing, insulation and drywall stages.

  6. Step 6

    Final sign off

    You get the finaled permit for your records, which matters a lot when you sell.

How a whole home project runs

Planned up front so it does not drift in the middle.

The single biggest cause of runaway remodels is starting construction before decisions are made. We lock selections before demolition.

  1. 01

    Walkthrough and scope

    Greg walks every room with you, checks the panel, the plumbing and the framing, and writes up what is involved in each space.

  2. 02

    Design and phasing

    Floor plans, 3D renderings for the key rooms, selections for every finish, and a phased schedule that keeps the house livable.

  3. 03

    Build in sequence

    Trades move through in order, inspections happen as each stage closes, and you get photos every Friday of what happened and what is next.

  4. 04

    Walk every room

    We go room by room with you, build a punch list, close it out, and hand over the finaled permits and warranty paperwork.

  • Open plan dining area with farmhouse table, hardwood floors and a view to the front entry
  • Bright remodeled kitchen with an island and a full wall of garden windows
  • Living room wall unit with window seats and glass front cabinets
  • Kitchen with a thin brick backsplash, granite island and professional range
  • Primary bathroom with travertine shower and dark wood vanity
Questions

Home remodeling questions.

What people ask before committing to a multi room project, answered the way we would answer at your kitchen table.

For a typical Orange County home of 1,800 to 2,500 square feet, a comprehensive remodel covering kitchen, bathrooms, flooring, paint, lighting, and trim generally lands between 150,000 and 400,000 dollars. Structural changes, moving plumbing walls, and high end finishes move it up from there. We can also phase the work across two or three stages if you would rather spread it out.

Service areas

Home remodeling across Orange County.

Whole home and multi room projects in every one of these cities, each with its own housing era and its own permitting rhythm.

Also nearby: Costa Mesa, Santa Ana, Orange, Anaheim Hills, Aliso Viejo, Laguna Niguel, Rancho Santa Margarita, Villa Park, Huntington Beach, Yorba Linda, Foothill Ranch, Ladera Ranch.

Free estimate

Let us walk the whole house.

Greg will go room by room with you, note what each space needs, and send back a phased estimate so you can decide what to do now and what can wait.

  1. Greg calls you back

    Usually the same day, always within one business day.

  2. We visit and measure

    About an hour at your place, at a time that suits you.

  3. You get it in writing

    An itemized estimate with materials and labor broken out.

4.9 average from 24 Google reviews
(714) 624-9514gregq@socalrenovations.comMonday to Friday, 7:00 AM to 6:00 PM

Tell us about your project

A few details is plenty. We will ask the rest when we call.

Room, rough size, what is bothering you about it now. A few lines is plenty.

No obligation, no sales calls. We reply within one business day.

Finished open plan dining room and kitchen
Ready when you are

One crew, one schedule, one house finished properly.

Greg will come out, measure, and give you an itemized estimate with no obligation attached. Most people hear back the same day they call.

  • Free in home estimate
  • Written itemized pricing
  • We pull your permits
  • Licensed and insured